1、摘 要在矿井的生产中,矿井运输占有重要的地位。其中,矿用的采煤机,刮板运输机,胶带运输机,矿用电机车是井下运输中的核心设备,这些集机械、电子、液压于一体的器械的有机组合,大大增加了煤矿的运输、生产效率。而人们对于矿井运输设备的设计严格的要求最优,首先对具体煤矿的工作条件、产量、运输量进行精确的测量与计算,然后选择最符合要求的矿井运输设备的型号,以发挥其运输的最大效率,最小的经济投入。 本次设计的主要目的是根据自己具体所选的煤矿,选择合适的矿井输入设备(主要有刮板运输机,胶带运输机,矿用电机车),其中对刮板运输机和胶带输送机的空重段承载量的计算,各点张力的计算,对与链与托辊、滚筒刚度的校核组成了
2、本次设计的核心内容。此次设计是对自己机械方面综合知识的测试与考验。本设计主要对矿井生产所用的提升及运输设备的选型进行的一次合理选择。矿井提升需要用一些专用的提升设备,主要有提升容器,提升钢丝绳,提升机,井架,装卸载设备以及一些辅助设备。矿井提升设备是矿山较复杂而庞大的机电设备,它不仅承担物料的提升与下放任务,同时还上下人员。矿井运输是煤炭生产过程的一部分,煤炭的井工生产中,运输线路长,巷道条件多种多样,运输若不畅通,采掘工作就无法继续进行,井工生产的煤矿运输作业,包括从工作面到矿井地面的煤炭运输和辅助运输,辅助运输包括矸石、材料、设备和人员运输。关键词: 矿井运输;校核;计算;提升机。 Abs
3、tractIn the production of mineral well,the translation of mine stand in a very improtant point,the mintral use of adopt coal machine ,pare off plank conveyance machine ,the tape transport machine,the mineral use an electrical engineering car is the well descend a comveyance in of core equipments,the
4、se organic combination of apparatus which gather a machine,electronices,liquid to press at the integral whole,consumedly increment of coal mine of conveyance ,produce efficiency.But people for mineral well conceyangce equipments of design strict of pursue superior,first rightness concrete cole mine
5、of work condition, yield,conveyance the quantily carry on precision of measure and calculation,then choice meet request most of mineral well conveyance equipments of model number,with exertive it conveyance of the biggest efficiency ,minimum of economy devotion. During this time ,the main propose fo
6、r design is according to oneself concrete choose of coal mine,choice accommodation of mineral well conveyance equipements main have already pared off plank conveyance machine, tape to transport machine to use an eletrical engineering car,among them to the dead load segment which pare off tigger conv
7、eyance machine and tape to transport machine loading quantily of calculation ,at all piont tension of calculation ,righness and chain with dragged along Kun,roller just the school of the degree pit to contitute this time core contents for design .This time design is to oneself machine comperhensive
8、knowledge of test and test.The origin designs mainly to the mineral well produce use of promote and transport a choose of equipments a type to carry on of a reasonable choice.The mineral well promotes to need to be use some appropriatively promote an equipments, mainly have already promoted containe
9、r, promote a steel wire rope, promote machine, well, pack to unload equipments and some assistance equipmentses.The mineral well promotes an equipments is mineral mountain more complicated but huge machine electricity equipments, it not only undertake a promote of material with next permissive duty,
10、 in the meantime return top and bottom personnel.The mineral well conveyance is a coal production line of a part, the well work of coal produce medium, conveyance circuit long, the tunnel condition is varied, conveyance if not unimpeded, digging work cant continue to carry on, the well work produce
11、of coal mine conveyance homework, include from work noodles go to mineral well ground of coal conveyance and assistance transport and lend support to a conveyance to include Gan stone, material, equipments and personnel to transport. Keyword: the translation of mine design; measure; Promote machine目
12、 录1 综采工作面配套设备选型11.1机械化采煤工作面类型的确定与论证11.2初选采煤机及其配套设备11.3初选采煤机主要技术参数的校核51.3.1最大采高的校核51.3.2最小采高的校核51.3.3采煤机最大截割速度的校核61.4采煤机、支护设备、输送机配套关系图62 矿山运输机械选型计算82.1回采工作面运输机械的选择82.1.1设计原始资料82.1.2刮板输送机的验算82.2采区运输顺槽运输机械的选择122.2.1转载机的选择122.2.2带式输送机的选型计算132.2.2.1带式输送机的验算142.2.2.2计算输送带的运行阻力142.2.2.3输送带的张力计算162.2.2.4输送带
13、的悬垂度和强度验算172.2.2.5牵引力及电机功率计算172.3采区上山运输及辅助运输设备选型182.3.1采区上山运输设备选型182.3.2采区上山辅助运输选择232.4大巷电机车运输选型232.4.1设计原始资料232.4.2列车组成计算242.5运输系统图293 矿井提升设备选型计算303.1设计原始资料303.2提升容器选型303.2.1提升方式选择303.2.2提升容器的选择303.3提升钢丝绳选择323.3.1钢丝绳绳端荷重323.3.2钢丝绳绳安全系数校验333.4提升机的选择333.4.1提升级滚筒直径333.4.2钢丝绳作用在滚筒上的最大静张力及最大静张力差:333.5提升
14、系统343.5.1天轮直径Dt343.5.2井架高度Hj343.5.3提升机滚筒中心到提升中心线间的水平距离Ls353.5.4提升钢丝绳弦长Lx353.5.5钢丝绳外偏角1和内偏角2353.5.6钢丝绳的仰角363.5.7电动机预选373.5.8变位质量计算383.5.9提升速度图的计算:393.5.10提升设备的动力学计算:433.5.11电动机功率校核454 JK系列提升机的电控系统设计与分析474.1 TKD-A电控系统的组成环节474.2 TKD-A电控系统的操作及动作系统615盘式制动器645.1性能与用途645.2结构特征与工作原理64结束语73参考文献74致谢75v1 综采工作面
15、配套设备选型1.1机械化采煤工作面类型的确定与论证某煤矿煤层最大厚度2.9m,煤层倾角6,煤层截割阻抗A375N/mm,顶板岩性:老顶为级,直接顶为2类,工作面设计长度为110m,设计年产量为90万t/年。本矿煤层赋存条件较好,煤层为进水平煤层,煤层厚度适中,为2.9m,井型为中型矿井,设计能力为90万t/年,直接顶为2类中等稳定顶板,老顶为类顶板,周期来压强烈,要求工作面支护强度较大。根据本矿工作面条件及我国目前采煤方法的类型及设备配套情况,设计确定工作面的方法为综采一次采全高。1.2初选采煤机及其配套设备根据采高,滚筒直径,截深,生产率,电机功率,牵引力及牵引速度,初步选择采煤机型号为MLS3H-340,查阅煤炭科学院等编制的采煤机械化成套设备参考资料一览表,确定选用ZC5-ZY35成套设备。但其刮板机的运输能力偏小,设计选取电机功率为320kW。且其机电设备选型大部分为国家淘汰产品,本次设计根据实际进行了适当调整。设备选型配套情况见下表141:表141 Z