ImageVerifierCode 换一换
格式:DOC , 页数:37 ,大小:3.83MB ,
资源ID:21388      下载积分:10 金币
验证码下载
登录下载
邮箱地址:
验证码: 获取验证码
温馨提示:
支付成功后,系统会自动生成账号(用户名为邮箱地址,密码是验证码),方便下次登录下载和查询订单;
特别说明:
请自助下载,系统不会自动发送文件的哦; 如果您已付费,想二次下载,请登录后访问:我的下载记录
支付方式: 支付宝   
验证码:   换一换

 

温馨提示:由于个人手机设置不同,如果发现不能下载,请复制以下地址【https://www.thwenku.com/down/21388.html】到电脑端继续下载(重复下载不扣费)。

已注册用户请登录:
账号:
密码:
验证码:   换一换
  忘记密码?
三方登录: 微信登录   QQ登录  
下载须知

1: 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。
2: 试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。
3: 文件的所有权益归上传用户所有。
4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
5. 本站仅提供交流平台,并不能对任何下载内容负责。
6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

版权提示 | 免责声明

本文(外文翻译-加强聚氨酯注射煤炭矿井顶板: 4个案例研究.doc)为本站会员主动上传,图海文库仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知图海文库(发送邮件至admin@thwenku.com或直接QQ联系客服),我们立即给予删除!

外文翻译-加强聚氨酯注射煤炭矿井顶板: 4个案例研究.doc

1、Reinforcing Coal Mine Roof with olyurethane Injection:4 Case StudiesGregory MolindaReceived: 16 November 2006 / Accepted: 13 March 2008 / Published online: 12 April 2008_ Springer Science+Business Media B.V. 2008Abstract:NIOSH has recently completed a study of the interaction between polyurethane (P

2、UR) and coal mine roof in order to determine the mechanism of reinforcement, in both highly fractured rock and unfractured rock. Four case studies of PUR reinforcement are presented. At a West Virginia site, a borehole camera revealed the location of roof voids and guided the PUR injection. By injec

3、ting polyurethane into a zone from 0.6 to 1.8 m (26 ft.) high in the roof, a roof beam was created and ongoing intersection falls were halted. In another highly fractured roof in a western Pennsylvania mine, a total of 5.8 cm (2.3 in.) of rubbleized rock was found in a zone up to 3 m (10 ft.) into t

4、he roof. Untargeted PUR injection filled approximately 1/2 of the fractures. These two case studies showed that it is not necessary to fill up 100% of the void space to create stability. In the other two field sites, polyurethane was injected into weak, but unfractured roof. Post-injection video mon

5、itoring showed that weak bedding planes were hydraulically wedged open and polyurethane injected along bedding. The reinforcement value of this injection method is limited because of the wafer-thin layer of PUR introduced along bedding, and the lack of a PUR webbing which would serve as a structural

6、 framework to provide strength.Keywords: Coal mining Ground control Roof falls Roof support Polyurethane1 BackgroundCoal mine roof strata has been successfully reinforced with polyurethane (PUR) for over 40 years。Applications have included headgate stabilizations,rock consolidation over coal panels

7、in advance of mining, and roof reinforcement for shield recovery.Polyurethane injection for ground stabilization in coal mines was first developed by the German coal mine research organization Bergbau-Forschung GmbH in the early 1960s (Jankowski 1972). It became a standard stabilization method in Ge

8、rmany after its commercial introduction in 1971 (Knoblauch 1994). With the introduction of the RokLok binder system in 1977, polyurethane stabilization, particularly in longwall recovery, has become common in the US (Stewart and Hesse 1985).Polyurethane injection in coal mines is most commonly used

9、in difficult ground conditions including fractured rock in headgates and tailgates, and as a stabilization remedy to prevent longwall face caving. It may also be used as a replacement for roof meshing in shield recovery, and as a sealant to prevent groundwater inflow, but often it is applied as a la

10、st resort where conventional roof reinforcement andsupport has failed.Polyurethane is typically a two component system that has several advantages over conventional support.It has the ability to chemically bond to the rock, unlike other supports which rely on frictional contact.Because it is injecte

11、d under pressure, it inherently targets fractures, which are the paths of least resistance. It also has a low viscosity which allows it to penetrate cracks as small as 0.05 mm (0.002 in.) wide (Knoblauch 1994). It has engineered expansion properties (1:1 to 1:12) which also allow for penetration.(Sh

12、aller and Russell 1986). It is both strong and plastic, preserving its integrity under load and racking-type deformations (Micon 2003). Finally, itdoes not obstruct roadways like standing support.2 Current PUR Injection Design ProcessInjection designs currently have a one size fits allapproach, with

13、 drilling patterns and chemical grout volumes decided in advance, often for the sake of convenience rather than engineering design. A design process is needed to determine the optimum location for injecting polyurethane grout in order to maximize the reinforcement benefit and prevent wasting large v

14、olumes of chemical.There are a number of variables which must be considered:1. The location of fracturesThis information will help determine the zone to target for polyurethane injection.2. The extent of the fracture zoneAn estimation of the total void space could be used to calculate the volume of

15、PUR needed. In highly fractured roof, more test holes may be required.3. Character of the fracturesA determination of the nature of fractures, whether they are beddingseparations or rubbleized zones, will indicate the permeability of the zone (Molinda 2004). Upholemapping of fractures will help defi

16、ne permeability.4. Injection pressuresOften the injection proceeds until a pre-determined injection pressure isachieved, indicating that the fractures are filled If no back pressure is ever achieved the indicationis that the fracture zone is infinitely large.Conversely, if a high back pressure is reached immediately or very quickly, then the roof is considered to be unfractured, and further pumping may hydrofracture the

网站客服QQ:2356858848

  客服联系电话:18503783681

copyright@ 2008-2022 thwenku网站版权所有

ICP备案:豫ICP备2022023751号-1


>


客服