ImageVerifierCode 换一换
格式:DOC , 页数:24 ,大小:2.06MB ,
资源ID:16347      下载积分:10 金币
验证码下载
登录下载
邮箱地址:
验证码: 获取验证码
温馨提示:
支付成功后,系统会自动生成账号(用户名为邮箱地址,密码是验证码),方便下次登录下载和查询订单;
特别说明:
请自助下载,系统不会自动发送文件的哦; 如果您已付费,想二次下载,请登录后访问:我的下载记录
支付方式: 支付宝   
验证码:   换一换

 

温馨提示:由于个人手机设置不同,如果发现不能下载,请复制以下地址【https://www.thwenku.com/down/16347.html】到电脑端继续下载(重复下载不扣费)。

已注册用户请登录:
账号:
密码:
验证码:   换一换
  忘记密码?
三方登录: 微信登录   QQ登录  
下载须知

1: 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。
2: 试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。
3: 文件的所有权益归上传用户所有。
4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
5. 本站仅提供交流平台,并不能对任何下载内容负责。
6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

版权提示 | 免责声明

本文(外文翻译-应用离散元法的放顶煤数值模拟.doc)为本站会员主动上传,图海文库仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知图海文库(发送邮件至admin@thwenku.com或直接QQ联系客服),我们立即给予删除!

外文翻译-应用离散元法的放顶煤数值模拟.doc

1、英文原文:Numerical simulation of the top coal caving process using the discrete element methodAbstractHow to understand the top coal caving process and increase the top coal recovery ratio is one of the urgent problems to resolve for longwall top coal caving technology. This paper discusses a new theory

2、 and technology of top coal caving with vibration. The vibration device is mounted on the shield beam of the top coal caving support. The vibrator destroys the arch structure formed during the top coal caving process, which results in the smooth top coal caving process, and in this way the top coal

3、recovery ratio is increased. The distinct element method (DEM) numerical software particle flow code in 2 dimensions (PFC2D) is used for the numerical simulation. It is proven that the vibration can easily destroy the arch structure which is formed during the top coal caving process. The parameters

4、about when the arch structure would be formed during the top coal caving process have been obtained. The movement of the top coal caving process under the vibration condition makes a more stable layer uniform caving performance. The aim of the top coal caving with vibration technology to increase th

5、e top coal recovery ratio and to lower down the waste content rate has been achieved.Keywords: Longwall Top coal caving Vibration DEM simulation Recovery ratio1. Introduction Since the mid 1980s, the longwall top coal caving(LTCC) technique has been widely used in China as an advanced under-ground c

6、oal mining method with high output and high efficiency 113. According to field experience in China, the top coal caving technique can be successfully applied to thick coal seams with moderate and low hardness. But as a new technology for the thick coal seam mining, longwall top coal caving technolog

7、y also brings about some new problems for the longwall mining system: rock controlling and mine safety. It is an essential issue in sustainable development of coal industry to keep higher recovery ratio. However, losses of coal are inevitable in LTCC technique since the top coal is caved from the up

8、 and rear of the supports. Therefore, it is one of the key problems in LTCC technique that how to obtain or even control the moving law of the top coal caving in order to increase the recovery ratio 1,4,5,716. In general, the LTCC technique is a conventional retreat longwall face with a second armor

9、ed face conveyor (AFC) towed behind the shields (as shown in Fig. 1) to recover the top coal that would otherwise fall into the goaf gob and be lost. There is a hydraulically operated tail-canopy at the rear of the LTCC support which can be moved up and down to allow the broken top coal in the goaf

10、area to spill onto the second AFC. This process is allowed to continue until all of the broken top coal is recovered and the waste rock appears. At this time, the tail canopies would be lowered and shut the gates.Unfortunately, there are some obvious weaknesses and short- comings in LTCC technique a

11、nd its support, which result in a lower recovery ratio and a higher waste rock ratio, especially at both ends of the working face because of the beaming capacity of the immediate roof. The fundamental reason for such an unfavorable feature of LTCC technique has been found. The LTCC technique is main

12、ly dependent on the influence of the beaming capacity, abutment stresses, bending strength, etc., which makes the top coal broken and fall naturally under the gravity condition. If the coal strength is low or the front abutment stress is high, the top coal can be broken easily into small pieces or b

13、locks, resulting in successive top coal caving and higher recovery ratio. But when the block of the broken top coal is big enough or the top coal is hard, the top coal caving process would be disturbed. The arch structure would be formed during the top coal caving process, one foot of which lies on

14、the shield beam, the other on the waste. The arch structure cannot be destroyed easily with the existing support structure automatically. The arch structure prevents successive upper top coal caving and lets the upper top coal stay in the gob, leading to a lower recovery ratio. That is the fundament

15、al reason for the low recovery rate.2. PrincipleThe technology of top coal caving method with vibration is proposed to solve the above problems 17,18. The fundamental principle for this technology can be demonstrated by Fig. 2. A vibrator is mounted on the shield beam of the longwall top coal caving

16、 support, which can produce low frequency vibration with high amplitude of force along the shield beam inclination. Based on the mechanical analysis, it is found that the vibration wave can decrease the loose material (top coal) inner and outer friction coefficient, decrease the top coal shear strength. As the function of the vibration, the internal friction angle is usually reduced by1度到3度while as the cohesive force c is decreased by 50% or more 19,20

网站客服QQ:2356858848

  客服联系电话:18503783681

copyright@ 2008-2022 thwenku网站版权所有

ICP备案:豫ICP备2022023751号-1


>


客服