外文翻译-国际煤矿开采技术.doc

文档编号:20555 上传时间:2024-03-22 格式:DOC 页数:7 大小:49.50KB
下载 相关 举报
外文翻译-国际煤矿开采技术.doc_第1页
第1页 / 共7页
外文翻译-国际煤矿开采技术.doc_第2页
第2页 / 共7页
外文翻译-国际煤矿开采技术.doc_第3页
第3页 / 共7页
外文翻译-国际煤矿开采技术.doc_第4页
第4页 / 共7页
外文翻译-国际煤矿开采技术.doc_第5页
第5页 / 共7页
外文翻译-国际煤矿开采技术.doc_第6页
第6页 / 共7页
外文翻译-国际煤矿开采技术.doc_第7页
第7页 / 共7页
亲,该文档总共7页,全部预览完了,如果喜欢就下载吧!
资源描述

1、外文资料World coal mining technology1underground mining 1outlined Currently, underground mining is the main hard coal mining methods. China, the former Soviet Union, the European introduction of the long wall coal mining law, the United States, Australia, South Africa, India and other countries are main

2、ly short wall coal mining law. France long wall coal mining output for 70% of world coal production.Since the 1960s, most coal mining conditions from deteriorating state, such as the German coal mining depth from the 1960 average of 726M to 927M 1995, the largest-1443M, the rock temperature was as h

3、igh as 43 degrees. Several countries pit mining depth table 1-1. Coal production is oil and natural gas (cost off cheap imported coal for the country is) competition and increasingly stringent environmental regulations restricting the use of coal quality retinue to set higher requirements. On the ot

4、her hand, microelectronic technology and technology at the core of his high-tech rapid infiltration to the coal industry. Both factors contributed to mine coal mining technology innovation. At present, coal mining is integrated mechanized mature technology; Microprocessors, computers and expert syst

5、ems applications, and rocks control theory and technology to improve and further enhance the operational safety and production efficiency. Developed countries are applying the research and development of a new generation of automation and robotics Underground coal mining systems. 2underground mining

6、 development trends (1) enlarge Experience has shown that in certain mining conditions, increased mining intensity is the main way to improve the economies of scale effect, and the Integrated Procurement of equipment to enhance production capacity, creating conditions for the expansion of the size o

7、f mine. Currently, a mining equipment Integrated largest production capacity has reached 3500T hours daily output can be maintained at 10000T above. Therefore, the annual number of new mine capacity to 3-4MT. Research a long wall located rapid advance to a district length increasing, the United Stat

8、es averaged 1996, 2570M, 1874M Australian average, the worlds largest-5365M (United States). Is much more than the length increase to 200M, 251M 1996, the average American, German 277M, 354M for the largest. This is a coal mining methods to promote innovation, such as using more long wall, turning t

9、o mining, a rotary workers, non-coal pillar mining. (2) focused production. Mine production is increasing production efficiency and effectiveness of centralized key factor is the main way to the conversion of existing coal merger, the closing uneconomic mines, the new high-yield, and efficient pit.

10、Germany in the period 1965-1995, the number of mine production reduced to 19 by 107, the average annual per mine to 2.79MT from 1.26MT, the average efficiency of coal-raising call from 2.705T/ 5.587T/ workers. Concentrated production of the key issues is to ensure that equipment and system reliabili

11、ty, as well as the coordination between the production chain. This requires addressing a range of technical and management issues. (3) streamlining the production system. Comprehensive mechanization in the coal mining basis of extraction integration, further simplification mining processes; Thick co

12、al bed once a high-grade mining replace; Using powerful tape carriers for the transport of the entire mine, reduce reproduced; Using single-track suspended, or no-card-car vehicles of equipment, materials, located directly transported; Simplified street layout, one lane use; as a quasi-open pit mini

13、ng in the coal bed. 3coal mining equipment Over the past 10 years, mining coal mining equipment and control systems have great progress, the main trends are : (1)adaptation.Caimeiji can exploit thick 0.556.0m, inclination 60 meridian east of the coal bed. Modular design for factory under specific ge

14、ological conditions shaft provide dedicated products, and ease of maintenance. (2)large-scale. To enhance the capacity and reliability of all coal mining equipment size, weight and power are tending to increase. Currently, the maximum weight has reached 90t Caimeiji since moved cradles of 50t/ aircr

15、aft. Germany Yikefu companies SL-500-Generation Caimeiji total power of 1508kW, 5000V power supply voltage, a high 2.25.0m. German production since moved supports for the coal bed 0.556.0m, Hemuxiate company produced two pillars for the United States strongly supports cover style, resistance to 8900

16、kN. China and the former Soviet Union has a 10,000-strong chamber of thick coal bed frames. Cradles into Group (615 helicopter) - fluid control has become a standard control system, time-8s have one of the following. Shun bed in the remote control system has been used in the production of microprocessors. High-yield, located a zone tape carriers largest transport capacity has reached 3500t/h, power

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 文档资料

网站客服QQ:2356858848

  客服联系电话:18503783681

copyright@ 2008-2022 thwenku网站版权所有

ICP备案:豫ICP备2022023751号-1


>


客服